View Single Post
  #7  
Old 06-12-2018, 07:05 AM
swiftz07 swiftz07 is offline
Registered User
 
Join Date: Mar 2007
Posts: 1,330
Default

Work begins on routing the channel for the end graft



Bindings and purflings are carefully incorporated





Stroke sanding the top and back






The completed box and neck





Levelling and test fitting the neck to the body



Fingerboard goes on

__________________

Collings OM2H Adi / Braz
Doerr Legacy Swiss / Braz
Franklin OM German / Braz
Franklin OM Carpathian / Braz
Goodall GC Italian / Honduran
Goodall GC Italian / Braz
Goodall CJC Italian / Braz
Goodall CJC Italian / Afr. Blackwood
McPherson 5.0 Full Koa
McPherson 5.0XP Adi / Braz
Martin D-28GE Adi / Braz
Reply With Quote