Put the bridge in place with a couple of bridge pins, drill two holes through the bridge and into the top behind say pins 1/2 and 5/6, Mix some epoxy up, smear it under the bridge, bolt the bridge down with small bolts
Leave 24-48hrs for epoxy to dry, string it up keep playing
Steve
__________________
Cole Clark Fat Lady
Gretsch Electromatic
Martin CEO7
Maton Messiah
Taylor 814CE
|