tick, tick, tick...
Always an anxious time during any build incorporating a burst (the waiting to see how it came out). The pore filler is on, the top has been sealed and the rosette, purfling and binding has been masked (1/16” tape, yikes!). John is waiting for a better weather window to spray the burst. I should see something soon...
__________________
A bunch of nice archtops, flattops, a gypsy & nylon strings…
Last edited by iim7V7IM7; 12-17-2017 at 04:21 AM.
|