View Single Post
  #8  
Old 10-29-2020, 03:41 PM
123davido 123davido is offline
Registered User
 
Join Date: Feb 2019
Posts: 28
Default

Good day today. I pulled the frets from 12,13 and 14 to give me some room to work. Then I cut the dowels from purple heart,drilled out the old holes and fitted them.Then when that was dry,I drilled out the tops and fitted plugs of meranti.Everything should be dry tomorrow and I can trim the plugs back. Then Im ready to work on the inlay.
Still waiting on the rosewood though.
I also sanded back the repaired joint and put a bit of sealer on it.Its going to be fun trying to match the slight sunburst effect under the heel.
I also finished my chisels and tidied the workshop!
Reply With Quote