Quote:
Originally Posted by thunderkyss
Thanks for your replies guys. Anyone want to comment on the time (on average) they invest in building sides?
|
Time is perhaps 50% more with double sides considering twice the material to cut, shape and thickness though cost is 2x more though. One does not merely do this to save time or material costs or the factories would follow suit.