Quote:
Originally Posted by Tim McKnight
The finish has cured for 14 days and its time to level sand and prepare to buff. I dry sand with 1000 grit to remove the orange peel. Then I wet sand with 1500 and 2000 grit prior to buffing.
|
Already looking great Tim! Abralon pad?